No.
|
Allocation
|
Area
(m2)
|
Ratio %
|
|
1
|
Industrial Area
|
911,519
|
59.00%
|
|
2
|
Housing for Experts & Workers Area |
124,625
|
8.07%
|
|
3
|
Administration Area |
16,737
|
1.08%
|
|
4
|
Roads & Transportation Area
|
217,500
|
14.08%
|
|
5
|
Parks and Green plants Area
|
233,313
|
15.10%
|
|
6
|
Service Area
|
26,355
|
1.71%
|
|
7
|
Waste Water Treatment Area
|
15,000
|
0.97%
|
|
Total Area
|
1,545,049
|
100.00%
|
|
Internal Transit System:
|

|
|
The system of internal roads is designed scientifically ensuring convenient transportation, completed internal connection and link to National Highway No. 10. Main roads are 50 meters wide. The road surface is covered by asphalt concrete, all internal roads are equipped with high pressure lighting system.
|
|
Electrical system:
|

|
|
24/24 power supply to industrial zones are available from the 110 KV power grid with a capacity of 100MW/day, internal power grid can supply electricity to receiving parts of each land lot.
|
H
|
Clean water system:
|

|
|
Clean water is provided 24/24 by local water plant with a capacity of 25,000m3/day night. Another internal water plant with a capacity of 13,000 m3/day reserved only for the industrial park will be built as well to ensure the clean water supply for the whole industrial park.
|
|
Sewage treatment system:
|

|
|
The waste water of Bao Minh Industrial Park will be initially treated by corresponding production plants before entering the centralized sewage treatment system of Bao Minh with a capacity 5,000m3/day and water output conformed to column A standard.
|
|
Information system infrastructure:
|

|
|
Bao Minh Industrial Park installs the undergrounded telecommunication cables, fiber optic systems ... provides connection to fences of land lots.
|
ệ thống điện:
|
|
|
|
|
|